4/7/24: Site 1 Belabula River. EPA Investigation Tests.

Three samples taken:

Site 1 – Foam/Water mixture supplied in an esky by a community member.

PFHxS 0.089ug/L, PFOS 36ug/L, PFOA 0.052ug/L

Site 1 – Belabula River at the location at which the community member said they had collected the foam in an esky. This location is just upstream of where the Cadiangullung Creek flows into the Belabula River.

PFHxS 0.003ug/L, PFOS 0.071ug/L, PFOA 0.008ug/L

Site 2 – Upstream on the Belabula River at Burnt Yards Rd bridge, Mandurama. This is about 18km of site 1

PFHxS 0.0043ug/L, PFOS 0.013ug/L, PFOA 0.0008ug/L

4/7/24: Site 1 EPA Study Belabula River (NSW). PFHxS, PFOS, PFOA

4/7/24: Site 1 Belabula River. EPA Investigation Tests.

Three samples taken:

Site 1 – Foam/Water mixture supplied in an esky by a community member.

PFHxS 0.089ug/L, PFOS 36ug/L, PFOA 0.052ug/L

Site 1 – Belabula River at the location at which the community member said they had collected the foam in an esky. This location is just upstream of where the Cadiangullung Creek flows into the Belabula River.

PFHxS 0.003ug/L, PFOS 0.071ug/L, PFOA 0.008ug/L

Site 2 – Upstream on the Belabula River at Burnt Yards Rd bridge, Mandurama. This is about 18km of site 1

PFHxS 0.0043ug/L, PFOS 0.013ug/L, PFOA 0.0008ug/L